# 12247 bywlm_efn@... on Feb. 4, 2012, 5:28 p.m.
Member since 2021-10-03
Correction in my figures for the land area required for SSP. It's 0.96
percent not 8 percent, to supply all the energy needs of the U.S. The
rectenna installations described in the various SSP studies would
deliver 5 Gw of power, not the 500 Mw I used.
1.05e20 / 31.4e6 seconds per year = 3336.4 Gw total power needed.
efficiency factor used for energy storage and transmission of
of the electricity for transportation, heating, etc. = 90%
adjusted power = 3336.4 Gw / 0.90 = 3701.1 Gw
3707.1 Gw / 5 Gw per installation = 742 rectenna installations
required.
rectenna installation area = 102.1 km2.
total area needed = 742 * 102.1 = 75.7 thousand km2.
lower-48 area = 7882911 km2
percentage = 100 * (75e3 / 7882911) = 0.96 percent.
sources:
1. Wikipedia for energy used by the U.S., and land areas.
2. Satellite Concept Power Systems Definition Study, by Nasa
http://www.nss.org/settlement/ssp/library/NASACR3317-
ExecutiveSummary.pdf
The 105 exajoules is based on today's energy usage, which includes
a huge amount of inefficiency in converting thermal energy from
fossil fuels into electricity and kinetic energy for transport.
--- In spacesettlers@yahoogroups.com, William wrote:

# 12248 bywlm_efn@... on Feb. 6, 2012, 5:14 p.m.
Member since 2021-10-03
Correction again: the dimensions of the rectenna array installations
are 12 x 15.8 km, not 10 x 13. (An exclusion area outside the arrays
themselves.)
rectenna installation area = 158.3 km2.
total area needed = 742 * 158.3 = 117393 km2.
lower-48 area = 7882911 km2
percentage = 100 * (117e3 / 7882911) = 1.489 percent.
Or, about the same land area as the state of Virginia.