The launch rate would depend on power available and launch to launch time.Just the time in preparing a launch tube for the next launch could be considerable.
So multiple launch tubes need to be part of the facility design solution. Facilities can be built in phases but in this case, any drilling would increase the risk of a launch especially for humans and other vertebrates.
Constructing a number of tubes might amortize the cost further.Two tubes at a time would ensure a backup.One could envision multiple sites with at least two tubes each. Maintenance alone would require multiple sites with multiple tubes.
From the business or consumer side, the ticket cost will depend on the costs of the design/build of launch facilities, operations/maintenance, and mission (destination/path/time in space). Since the ground facilities will be the greatest cost without regard to specific mission, that is where any business plan for space needs to focus. The ground facilities will require an international airport (50 to 100 miles of surface land with subway tunnels to the loading zone.
Dollars per pound tries to reduce all the various costs to one figure. In reality, it's the dollars per pound per mission. An up and back mission to LEO in one day is quite different than a two week orbital mission. The rough estimate begins with the weight of the humans. Add to that ten times (10x) the weight for food and air per week.
Given the launch rate and the facility requirements, whole cities would need to be built just to house the workers and guests.
David
Regards,
Mike Combs