model train G-Lab concept

Forum: SSI-List
Thread: model train G-Lab concept

# 23124 byRobert Smith on March 16, 2018, 10:56 a.m.
Member since 2022-08-22

Cool Joe, very cool. Gotta pass this to Gary.

Is High Frontier able to sim something like this?
Smith

I've been thinking for a while how to scale down the G-Lab concept into itsmosteconomicalform.IthinkI'vegotit:

It's basically a (custom-built) model train, running around the wall of a BA-330 module. Picture something like a G-scale (garden scale) train or slightly larger; each car is about 30 m long, and both track and cars are curved slightly to match the curvature of the wall (er, floor). It's a *long* train, going all the way around the 19.6 m track; if the cars are about 30 cm long, then there are 65 of them including the engine(s).

The cars themselves are basically flatbeds, with a large indentation in which a mouse cage can rest (with weak magnets to hold it in place under microgravity).Themousecagecanbeeasilyliftedofforreplaced.

The engine and the cars both pick up power from the track; the cars also passthisontothecage,whereitcanrunalittleWiFicamineachone.

In its simplest implementation, that's pretty much it. We'd probably actually run two identical tracks, in opposite directions, and hooked up to the same speed controller, so as to avoid imparting any spin to the station. Researchers would simply slow the trains to a stop when they needtofreshenthecagesorstudythemice.

However, that might be more downtime than we want (it could take hours to work through all those cages). So here's a possible enhancement: attached to the central pillar is an inverted track (like a roller coaster), with a small crane. This is basically a motorized winch with a claw or strong electromagnet on the end, that fits a corresponding attachmentpointonthetopofeachcage..

This would be under computer control, so the researcher would tell the computer, "pick up cage 17," and it would spin up the crane to match the track speed, position the crane head over cage 17, and lower the claw/electromagnet. Having grabbed the cage, it would then reel it in, and then slow to a stop next to the researcher, who would measure the mice, clean/replace the cage, etc. When done, the researcher attaches the cage back to the crane, says "place on car 17," and the crane reverses the process, matching speed/position and then lowering the cage intoposition.

All this seems very cheap and low-risk to me; decades of model trains have amply demonstrated most of the technology involved. It also doesn't take too much room on the station, block the researcher's passage from one end of the station to the other, etc. The whole thing comes as a kit, assembled by the researchers the first day, and put through its paces before they put the mice inside. When our BA-330 lease is up, the researchers simply take it back apart and pack it back intotheboxesitcamein.

We might even be able to get a company like Lionel to produce any custom trackpartsorenginerequired,forthecoolpublicityitwouldbringthem.

Whatdoyouallthink?

Best,
-Joe

Robert Smith
Space Studies Institute
web: http://www.ssi.org
the space studies institute is a 501(c)(3) non profit organization
founded in 1977 to promote the education and engineering
for the Human Breakout Into Space